Directory of RSS feeds
Statistics

RSS feeds in the directory: 374

Added today: 0

Added yesterday: 0

Mass media / Information Agency

The Federal road constructors of Altai checked the quality deicing materials

IA "My Altai" 04.10.2019 at 11:47

Information portal Altai Krai and Altai Republic

PKU uprdor "Altai" has assessed readiness for the winter subcontractors working on Federal highways of the Altai territory and Republic of Altai: P-256 "Chuya" and A-322. Events are held in accordance with the schedule.

"To the cold weather the road will be fully prepared for winter operation, – noted the Deputy chief of management of Federal highways "Altai" Vladimir Dubrovsky. – Pay special attention to roadway bridges and overpasses: they are in the transition period may be unfavorable for motorists conditions."

Preparing for winter drainage facilities and culverts, in two regions of their 1 200, work performed on 95%. Contractors carry out technical inspection and refitting of specialized machines, arrange a warm Parking and heated restrooms and heating workers. In parallel completes the formation of a stock of de-icing materials, prepared more than 5 thousand cubic metres of sand and more than 40 thousand tons of sand-salt mixture. All of them are strict laboratory control.

"Each organization performs input control, our task – selective, – explained the head of quality control Department Alexander Soloviev. The quality of sand determined in specialized laboratories by a number of indicators: grain composition, the presence of dust particles, and others. Based on the data evaluated frictional characteristics of sand to improve traction coated and provide the environmental burden accompanying motorway have been zone".

If the test materials there will be inconsistencies in the international standard, to be used for the treatment of roads they will not. Past control PGM stored in packebusch contractors located along the Federal motorways on average every 45 km. Of absolute readiness contractors will report by 1 November, but work teams have already been formed and is ready for round the clock duty in the event of bad weather.